二十四节通天谷-空息的关文,office2016破解激活教程,欧美亚洲激情视频

News

news center

Production News Express

Delivery and Departure of 4600 TEU Container Vessel "Xin Yi Hai"

2025-01-11 views 156


On the morning of January 11th, the first 4600 TEU container vessel "Xin Yi Hai" built by our group’s New Yangzi Shipbuilding for Trawind Shipping was delivered and departed from the shipyard wharf for operation.The vessel is an energy-saving and environment-friendly container vessel with excellent portability and strong market competitiveness. After being put into operation, it will help the shipowner to further optimize the fleet structure, provide customers with better transportation services, and enhance the company's operation and management capability and market competitiveness.


 

"Xin Yi Hai" measures 228m in length overall,224.52m in length between perpendiculars,40m in moulded width,19.6m in moulded depth and a design draft of 13.75m.The vessel cut the first plate at the end of January,2024 and was built in accordance with the rules and regulations of class CCS.


On January 8th, Mr. Liu Xinghua, General Manager of Trawind Shipping & Logistics, and Mr. Du Chengzhong, Deputy General Manager of the Group and General Manager of New Yangzi Shipbuilding, signed the delivery protocols on behalf of the ship owner and the shipyard respectively.




佩尔卡西| 摩尔平台| freeokpro浏黄器打开| 上海别墅装修| 体育吧直播| 代谢重编程曼什么家巴| 99首页| maya2016序列号和密钥| 蒙古语视频敦程| 幼儿歌曲大全093岁| ce调试翳| 排球少年第五季什么时候出| 厦门草莓音乐节| 江苏沿海地区发展规划| 日本MV与欧美MV的区别| 品牌日| 2023欧美最顶顶级av艳星| 电视剧珠帘玉幕| 黑夜传说2电影完整版在线观看| 哈小浪搐笑视频| moslate德国牌子怎么样| 男人和女人亲热| 欧美做爱猛烈大尺度电影无法无天| 赵礼显立体几何| 《酒店激战》动漫1-5集免费观... | 高兴的酸甜苦辣| 动国片奥特曼少儿全集免费 视频 冬天倒开水时 客易想破的杆子是 | 咪咕体育频道| 金唐群怏传1攻略全流程| 其他企业